Artillero
31 transformation kiosks with 2500 kVA 31.5/0.69 kV devices operated for the wind farm located in Rosendo Mendoza, Colonia, for the firm Suzlon. This station was developed by the company Rouar SA and implied an investment of approximately 100 million US dollars. It has 31 wind turbines of 2,1 MV of unitary power which provides a total of 65,1 MV.
Polesine
21 transformers of 2700 kVA 31.5/0.66 kV installed in the wind park Polesine, located in Florida, within the frame of a supply provided to Jayme da Costa. The project was awarded to the firm Akuo Energy, that led the development of the works. The power installed in this case is of 50,4 MW and has 21 turbines of 2,4 MV power each.
La Jacinta
26 transformers of 2300 kVA 20/0.41 kV made for the photovoltaic power station of the firm OHL, which led the project of the first large scale solar farm in Uruguay. Located in the North of the country, in the department of Salto, it has an installed power capacity of 64,8 MWp and it is estimated that its power production will imply a decrease of more than 74 thousand tons of CO2 annually.
Tomás Gomensoro
11 transformers of 2400 kVA 31.5/0.42 kV manufactured within the frame of another photovoltaic power station installed in the northern area of the country, in the town of Tomás Gomensoro, department of Artigas. The firm Solarpack was in charge of the development of the project and it has an installed power capacity of 26 MW.
Melowind
22 Pad-mounted transformers of 2700 kVA 31.5/0.66 kV” manufactured for Nordex within the frame of Melowind wind farm, led by firm Enel Green Power, located in the department of Cerro Largo. The project required an investment of 98 million US dollars and its installed power capacity is of 50 MW. It is estimated that is operation would avoid the emission of more than 62,000 tons of CO2 to the atmosphere.
Proyecto Pampa
59 kiosks with transformers of 2700 kVA 31.5/0.66 kV as part of Pampa project, in Tacuarembó, which will consolidate as the largest wind farm in the country. The project, led by Nordex, provides 2.4 MW per wind turbine which generates a total power capacity of 141.6 MW.
Tecnogroup
60 transformers of 1360 kVA 31.898/0.38-0.38 kV Dy11y11 for firm Tecnogroup, as part of several projects distributed in diverse national locations within the expanding industry of photovoltaic energy. The collaboration between 2 Uruguayan companies that bet on renewable energy in this development was really good and it is intended to repeat this collaboration abroad.
Assuruá
8 transformers of 4360 kVA 34.5/0.6-0.6 kV D0d0d0 manufactured for the photovoltaic power station installed in Assuruá, in Bahía, Brazil. Siemens was in charge of the development of the project and it was a huge challenge to combine the integration of the transformer in the skid-mounted substation and to comply with the short terms stipulated for the delivery. The devices had to travel around 4,000 km and the transportation and unloading were carried out safely. Partiluz also supervised the assembly and energization with its own equipment. It is a pride for Partiluz and for the Uruguayan industry to achieve the first exportation of these devices destined to the use in the generation of renewable energy.